MiningNews

Eldorado Gold output up by 34% in 2020

The strong performance at Lamaque was partially offset by lower labour availability impacting leach pad flow rates at the Kışladağ mine, in Turkey, during the second quarter.

Production was also hit last year by an output drop at Efemcukuru underground mine, also in Turkey, and at Olympias gold-silver-lead-zinc mine, in northern Greece. 

President and CEO George Burns said that delivering the company’s production guidance amid a year of unprecedented external challenges was a testament to the dedication and resilience of its people.

New chair of the board 

The Vancouver-based gold miner also announced that Steve Reid was appointed as chair of the Board, replacing George Albino. Albino will continue to serve as a director on the board.

Reid has over 40 years of experience in the industry. He was executive vice president and chief operating officer for Goldcorp from 2007 to September 2012. Previous to that, he spent 13 years at Placer Dome in numerous corporate, mine management and operating roles.

At Eldorado, Reid has served as a director of the board since May 2013 and is said to have contributed significantly to Eldorado’s success.

View Article Origin Here

Related Articles

Back to top button